Project Overview

EXTERNAL PROJECT OVERVIEW


 How do I complete the project overview details?

What kind of information should be added under the Summary of Proposed Project?

What kind of information should be added under the Number of Persons Employed?

What kind of information should be added under the Location and Access?

What kind of information should be added under the Previous Mining History?

What kind of information should be added under the Outline of Work Rosters?

What kind of information should be added under the Contractor Management?

Can I attach files to the approval?


How do I complete the project overview details?

  • Within Project Overview Details section type in the details of the Project Overview into the appropriate fields. An overview of the project details is required. Provide a summary of the proposed project, including an outline of the major stages of its life cycle, the number of persons employed, location and access, previous mining history, outline of work rosters and contractor management are mandatory fields. Text can be entered in the text box provided. The field is scrollable, to cater for details that exceed 5 lines.

[Back to top]


What kind of information should be added under the Summary of Proposed Project?

  • A summary is required covering the major aspects of the proposal such as the type of mine and treatment of product.

[Back to top]


What kind of information should be added under the Number of Persons Employed?

  • Detail number of persons to be employed on the project during the construction phase, and the operation phase. For the project operation provide an approximate breakdown of the number of persons to be employed by the principal employer and contractors.

[Back to top]


What kind of information should be added under the Location and Access?

  • Describe the location of the mine. Attach a plan(s)  of the proposed mine showing  its relationship to the immediate locality, the region and Western Australia. The principal access route or routes to the mine site need to be shown.

[Back to top]


What kind of information should be added under the Previous Mining History?

  • A  summary is required together with plans, cross and long sections of any mining operations (current or abandoned) in the vicinity which may impact on the proposed mining operation.

[Back to top]


What kind of information should be added under the Outline of Work Rosters?

  • A brief overview is required of the proposed method of operation, for example whether the mine will operate as a long distance commuting operation or commute daily from a regional centre. Provide details of the work or commute roster and the hours of work.

[Back to top]


What kind of information should be added under the Contractor Management?

  • An outline is required as to the framework for the management of contractor risks for all major phases, including construction, development and operation.

[Back to top]


Can I attach files to the approval?

Yes, supporting documentation can be attached to many of the individual sections of your submission.

For instructions and information, including how to attach a file, view the help guide section titled 'Include File Attachments'.

[Back to top]



Previous Page

Page Last Modified: 28-Jan-2011