Submission tab - Technical Submissions

Submission - (External)

From 31/3/22 (effective Work Health and Safety Act, WHSA2020), there is no requirement to submit a Technical Submission in SRS, of the type dredge, winding, high voltage installations and Winding.  Please refer to specific mines safety submissions.

Under the submission tab you will be able to see details of the submission in the - Approved, Approved Conditional or Withdrawn status.  


Back to Technical Submissions landing

Previous Page

Page Last Modified: 01-Jun-2018